Thursday, May 1, 2014

The 6th Day(The Final Day of 25 Hours)

Monday April 28, 2014                                                                                                                   8 hours
          Monday was the last day before I had completed my 25 hours with my mentor. We had successfully focus on switches, speaker sound structures, and learn more about diodes. When we talked about switches we discussed, that switches can have resistors and fuse, to protect the wire from over flow current. Then when we focused on speakers, we encounter parallel and series speaker connection structure. As a result, I found out that speakers have different wave levels, that causes different sounds and need certain devices to be played. The devices were sub-woofers, mid range, and tweeters. We finally finished, by talking about diodes with 3 parts and circular shaped diodes. I learn the names of the parts and found out what they contribute. Throughout the the hours, we open devices and clean the dust that is inside because dust are a big impacted in over heating devices. The challenges i encountered was the constant verbal communication, because i had trouble getting a picture in my head, with out knowing the substance and the components that was mentioned. On Monday, I personally got to learn about speakers sound control and connection structure. The sound structure on speakers, that i learned was sub-woofer witch has low waves,mid range witch has middle sound waves, and tweeters witch has high pitch waves. My mentor agreed to keep on going to see him and to see myself taking electrical engineering classes in college. We came up with a agreement on scheduling and comprehending level sequence.

Total time for this session was :8 hours
Total logged time : 8 hours

No comments:

Post a Comment